I’m Jim, I’m an engineer and I represent one of the hundreds of people working on Snowy 2.0.
Snowy 2.0 is the next chapter of the Snowy Scheme.
9 power stations
16 dams
145km of tunnels and pipelines
80km of aqueducts
Snowy 2.0 connects two existing dams in the Snowy Scheme with 27km of waterway tunnels. In the middle is an underground pumped-hydro power station that generates power when water passes through it.
Meet my colleague Jane, she’s an energy trader and she’ll show you how.
Now come with me and I’ll explain how Snowy 2.0 helps deliver Australia a future with plenty of reliable, affordable, clean energy.
Let's go